Customer Reference Specifications

Rules for Electric Meter and Service Installations (REMSI)

Specification Number Description
6-09-192
Replaces
LA-17251

Updated: 1/16/2017
12kV 3-Phase Service Interrupter Switch on Customer-Owned Pole (Overhead Supply to Underground)
6-09-194
Replaces
A-128453

Updated: 1/16/2017
12kV 3-Phase Service Interrupter Switch on Customer-Owned Pole (Overhead Supply to Overhead)
6-09-195
Replaces
A-188075

Updated: 1/16/2017
7.2kV Single Phase Service Interrupter Switch on Customer-Owned Pole Overhead Supply to Overhead or Underground
6-09-196
Replaces
A-188076

Updated: 1/16/2017
12kV 3-Phase Service Metering on Customer-Owned Pole (Overhead Supply to Overhead)
6-09-197
Replaces
A-188077

Updated: 1/16/2017
12kV 3-Phase Service Metering on Customer-Owned Pole (Overhead Supply to Underground)
6-09-199
Replaces
LA-17936

Updated: 1/16/2017
3-Phase, 4 Wire WYE 7,200/12,470V Service Termination and Metering Compartments in Customer-Owned Switchgear, Underground Supply
6-09-200
 
Updated: 1/16/2017
7.2kV Single Phase Service Metering on Customer-Owned Pole Overhead Supply to Overhead or Underground
6-10-165
Replaces
CRS-1001
A-190555 (6-01-141)
A-197765 (6-10-165)

Updated: 9/25/2017
Requirements for Service to Customer-Owned Street Lighting Systems Served Under Rate Schedule SE
6-14-121
Replaces
CRS-1003

Updated: 11/21/2024
Requirements for Trenching and Backfilling by Developer/Customer for Primary and Secondary Installation in a Trench Underground - General Specifications
6-14-125
Replaces
CRS-1010

Updated: 12/05/2016
Customer-Installed Screening of Pad-mounted Devices

Underground-General Specifications

Clearance Requirements for Placing Plants, Shrubbery or Structures around padmounted devices - Don't forget to "Call before you dig" dial 811, Know what's below!

6-15-160
Replaces
A-168712

Updated: 5/25/2020
Customer Installed Precast Manhole - Underground Structural
6-15-180
Replaces
6-15-181

Updated: 5/25/2020
Customer Installed Duct System - Underground Structural
6-17-122
Replaces
CRS-1002

Updated: 3/27/2017

Customer Installed Three-Phase Pad-Mounted Precast Transformer Foundation

Pad-Mounted and Submersible Transformers

6-17-163
Replaces
LA-17616

Updated: 1/30/2017

Customer Installed Transformer Vault; Vault Arrangement And Grounding Details 30 KVA to 2500 KVA Capacity

Pad-Mounted and Submersible Transformers

6-18-115
Replaces
CRS 402C-115
Replaces
CRS-1005

Updated: 4/27/2016
Installation Instructions for Customer Installed Conduit Systems on PPL Terminal Poles
6-19-100
Replaces
A-190556

Updated: 10/24/2016

Customer Low-Voltage Switchboards Service Cable Terminal Compartment Arrangements and Clearances

Underground Secondaries and Services

6-19-133
Replaces
CRS-1014

Updated: 10/24/2016

Installation of 120/240 Volt Single-Phase Underground Lateral Sharing a Trench with Other Utilities (Joint Trench)

Underground Secondaries and Services

6-19-134
Replaces
CRS-1009

Updated: 10/24/2016

Requirements for Trenching and Backfilling by Customer for 120/240 V Underground Service Laterals Installation in a Trench with only Electric Lines (Non-Joint Trench)

Underground Secondaries and Services

6-22-130

Effective: 8/5/2019
Installation Instructions for Ultra Service Park For Precast Concrete Foundation For Three-Phase Pad Mounted VCR
6-22-187
Replaces
CRS-1006
406C-187

Updated: 12/3/2018
Installation Instructions for Three-Phase, 200 Amp Switchgear Foundation
6-22-197
Replaces
CRS-1007
406C-197

Updated: 12/3/2018
Installation Instructions for Three-Phase, 600 Amp Switchgear Foundation
6-22-198
Replaces
CRS-406C-198

Updated: 12/3/2018
Installation Instructions for Precast Concrete Foundation For Three-Phase Pad-Mounted Manual or Automatic Source Transfer Switch
6-22-199
Replaces
CRS-1008
406C-199

Updated: 12/3/2018

PPL EU Ultra Service Park

Typical Utility Plan

See Vegetation Management

Updated: 6/15/2016
Right-of-Way Clearing of Customer Service Extensions