Sketch # |
|
04/09/2019 - Changed the title Emergency (Stand-by) Generation Organization Map to Emergency (Stand-by) Generation Sketch Table. | |
04/09/2019 - Changed the title Distributed Energy Resources (DER)Sketch Organization Map to Distributed Energy Resources (DER)Sketch Table. | |
04/04/2019 - Changed the title Distributed (Renewable) Generation Organization Map to Distributed Energy Resources (DER) Organization Map. |
Sketch # |
|
12/11/2018 - Added CRS 6-09-200 in Master Sketch Table-Primary Overhead 12kV. | |
12/11/2018 - Removed the wording '600A max' from Master Sketch Table Single Phase-Overhead on Sketch 5. | |
12/11/2018 - Included Sketch 53 on Master Sketch Table-Single Phase-Underground. | |
Removed Self-Contained 480V Metering Organization Map. |
Sketch # |
2017 Changes, Updates and Additions |
|
60 |
12/29/2017 – Removed sketch – Typical arrangement of outdoor metering equipment on building, underground service lateral from OH or UG distribution, single phase, 240/480 volts self-contained, 200 ampere |
|
61 |
12/29/2017 – Removed sketch – Typical arrangement of outdoor metering equipment on building, underground service lateral from OH or UG distribution, single phase, 240/480 volts self-contained, 400 ampere |
|
70 |
12/29/2017 – Removed sketch – Typical arrangement of outdoor metering equipment on service and meter pole |
|
71 |
12/29/2017 – Removed sketch – Underground secondary service, indoor multi-meter installation for common service with instrument cabinets and/or meter bases |
|
72 |
12/29/2017 – Removed sketch – Overhead or underground secondary service, indoor/outdoor multi-meter installation for common service with instrument transformer cabinets and/or meter bases |
|
73 |
12/29/2017 – Removed sketch – Typical arrangement of outdoor metering equipment on building |
|
80 |
12/29/2017 – Removed sketch – Typical arrangement of outdoor metering equipment on building, underground service, lateral from OH or UG distribution, 3 phase, 277/480 volts self-contained, 200 ampere |
|
81 |
12/29/2017 – Removed sketch – Typical arrangement of outdoor metering equipment on building, underground service, lateral from OH or UG distribution, 3 phase, 277/480 volts self-contained, 400 ampere |
|
82 |
12/29/2017 – Removed sketch – Typical arrangement of outdoor metering equipment on building, OH distribution |
|
83 |
12/29/2017 – Removed sketch – Typical arrangement of outdoor metering equipment on building, lateral from OH or UG distribution |
|
Distributed (Renewable) Generation Organization Map- 12/18/2017
|
||
25C |
12/18/2017 - Removed sketch - Secondary service meter base connections for self-contained meters overhead service. |
|
25D |
12/18/2017 - Removed sketch - Secondary service meter base connections for self-contained meters underground service. |
|
57 |
12/18/2017 - Removed sketch – Inverter-Based Renewable generation for generator capacity up to and including 20% of the load center bus bar rating for 480V, self-contained metering installations. |
|
57A |
12/18/2017 - Removed sketch – Inverter-based renewable generation for generator capacity over 20% of the load center bus bar rating for 480V, self-contained metering installations. |
Sketch # |
2016 Changes, Updates and Additions |
3 |
09/19/2016:
|
4 |
09/19/2016 - Added note that structure must be installed in an area which is not accessible to vehicular traffic. |
5 |
09/19/2016 - Updated max tension to 850 lbs. |
6 |
09/19/2016 - Updated max tension to 850 lbs. |
14 |
09/19/2016 - Updated layout and added bonding jumper size to notes. |
14A |
09/19/2016 - Updated layout and added bonding jumper size to notes. |
14B |
09/19/2016 - Updated layout and added bonding jumper size to notes. |
14C |
09/19/2016 - Updated layout and added bonding jumper size to notes. |
14D |
09/19/2016 - Updated layout and added bonding jumper size to notes. |
15 |
09/19/2016 - Updated layout and added bonding jumper size to notes. |
15A |
09/19/2016 - Updated layout and added bonding jumper size to notes. |
25 |
09/19/2016 - Corrected diagram of 2 Wire, 1 Phase, 120V meter base |
30 |
09/19/2016:
|
31 |
09/19/2016:
|
32 |
09/19/2016:
|
33 |
09/19/2016:
|
34 |
09/19/2016:
|
39 |
09/19/2016:
|
47 |
09/19/2016:
|
48 |
09/19/2016 - Minor updates to sketch |
50 |
09/19/2016 - Updated clearance from the bus work to front of cabinet from 1" to 1.5" |
54 |
09/19/2016 - Updated Note 5 & 6 |
54A |
09/19/2016 - Updated Note A |
56 |
09/19/2016:
|
56A |
09/19/2016:
|
57 |
09/19/2016:
|
57A |
09/19/2016:
|
58 |
09/19/2016:
|
58A |
09/19/2016:
|
59 |
09/19/2016:
|
59A |
09/19/2016:
|
59B |
09/19/2016:
|
60 |
09/19/2016:
|
61 |
09/19/2016:
|
70 |
09/19/2016:
|
71 |
09/19/2016:
|
72 |
09/19/2016:
|
73 |
09/19/2016:
|
80 |
09/19/2016:
|
81 |
09/19/2016:
|
82 |
09/19/2016:
|
83 |
09/19/2016:
|
90 |
09/19/2016 - Added new Sketch on single phase outdoor metering equipment on customer-owned meter pole |
Sketch # | 2011 Changes, Updates and Additions | |||
3B |
03/18/11 – Updated Format and Content |
|||
7 |
03/18/11 – Updated Format and Content |
|||
7B |
03/18/11 – New Sketch |
|||
8C |
08/12/11 – Updated Format & Content |
|||
8D |
08/12/11 – New Sketch |
|||
Sketch 16 Series - Sketch 16A has been revised, reformatted and updated into a series of sketches:
|
||||
20 |
08/12/11 – New Sketch |
|||
49 |
08/12/11 – Updated Title & Format |
|||
54A |
08/12/11 – Updated Title & Format |
|||
55 |
08/12/11 – Updated Format & Content |
|||
Distributed Generation Sketch Series have been updated, expanded and renumbered for organization. Each sheet has had content updated or in new. The new Distributed Generation Series is as follows: |
||||
Distributed Generation Organization Map |
||||
Metering Type |
Voltage |
Load Center Bus Bar Rating |
Sketch # |
|
Self-Contained |
Less than 480 V |
Up to and Including 20% |
56 |
|
Self-Contained |
Less than 480 V |
Over 20% |
56A |
|
480V Self-Contained |
480 V |
Up to and Including 20% |
57 |
|
480V Self-Contained |
480 V |
Over 20% |
57A |
|
CT/Secondary |
Less than 600 V |
Up to and Including 20% |
58 |
|
CT/Secondary |
Less than 600 V |
Over 20% |
58A |
|
12 kV |
12 kV |
Pole Mount |
Up to and Including 20% |
59 |
12 kV |
12 kV |
Pole Mount |
Over 20% |
59A |
12 kV |
12 kV |
Switchgear |
All Options |
59B |
Customer Reference Specifications - List of Changes - 2020 |
CRS 6-15-160 - Customer Installed Precast Manhole- Underground Structural Effective 5/25/2020 |
CRS 6-15-180 - Customer Installed Duct System- Underground Structural
|
Customer Reference Specifications - List of Changes - 2019 |
CRS 6-22-130 - Installation Instructions for Ultra Service Park for Precast Concrete Foundation for Three-Phase Pad Mounted VCR
|
Customer Reference Specifications - List of Changes - 2018 |
CRS 6-15-160 - Underground Structural Customer Reference Specification Installed Precast Manhole Specification
6-15-160-A - Removed page numbers
|
CRS 6-15-180 - Customer Installed Duct System – Underground Structural
|
CRS 6-22-130 - Installation Instructions for Precast Concrete Foundation for Three-Phase Pad Mounted VCR Effective 12/03/2018 - New to REMSI Customer Reference Specification |
CRS 6-22-187 - Installation Instructions for Three-Phase, 200 A Switchgear Foundation Effective 12/03/2018 - Updated since overall Spec 6-22 has been revised |
CRS 6-22-197 - Installation Instructions for Three-Phase, 600 A Switchgear Foundation Effective 12/03/2018 - Updated since overall Spec 6-22 has been revised |
CRS 6-22-198 - Installation Instructions for Precast Concrete Foundation for Three-Phase Pad-Mounted Manual or Automatic Source Transfer Switch Effective 12/03/2018 - Updated since overall Spec 6-22 has been revised |
CRS 6-22-199 - PPL EU Ultra Service Park Typical Utility Plan Effective 12/03/2018 - Updated since overall Spec 6-22 has been revised |
Customer Reference Specifications - List of Changes - 2017 |
6-10-165 – Requirements for Service to Customer-Owned Street Lighting Systems Served Under Rate Schedule SE Effective 09/25/2017 – Identification – Added note requiring addition of number (2) and CID 323301 for 2 inch wide, yellow and black diagonal striped, pressure sensitive adhesive tape. |
6-17-122 – Customer Installed Three-Phase Pad-mounted Precast Transformer Foundation Effective 03/27/2017 – “All protective barriers must be removable bollards (constructed as or equivalent to 6-17-122G)” in Note 13. Updated 6-17-122-G as removable bollard. |
6-22-187 – Install Three-Phase, 200 A Switchgear Foundation Effective 03/27/2017 Below are the updates:
|
6-22-197 – Install Three-Phase, 600 A Switchgear Foundation Effective 03/27/2017 Below are the updates:
|
6-22-198 – Ultra Service Park Precast Concrete Foundation Effective 03/27/2017 Below are the updates:
|
6-09-192 – 12kV 3-Phase Service Interrupter Switch on Customer-Owned Pole (Overhead Supply to Underground) Effective 01/16/2017. Below are the updates:
|
6-09-194 – 12kV 3-Phase Service Interrupter Switch on Customer-Owned Pole (Overhead Supply to Overhead) Effective 01/16/2017. Below are the updates:
|
6-09-195 – 7.2kV Single Phase Service Interrupter Switch on Customer-Owned Pole (Overhead Supply to Overhead or Underground) Effective 01/16/2017. Below are the updates:
|
6-09-196 – 12kV 3-Phase Service Metering on Customer-Owned Pole (Overhead Supply to Overhead) Effective 01/16/2017. Below are the updates:
|
6-09-197 – 12kV 3-Phase Service Metering on Customer-Owned Pole (Overhead Supply to Underground) Effective 01/16/2017. Below are the updates:
|
6-09-199 – 3-Phase, 4 Wire WYE 7,200/12,470V Service Termination and Metering Compartments in Customer Owned Switchgear Effective 01/16/2017. Below are the updates:
|
6-09-200 – 7.2kV Single Phase Service Metering on Customer-Owned Pole (Overhead Supply to Overhead or Underground)
|
6-10-165 – Requirements for Service to Customer-Owned Street Lighting Systems Served Under Rate Schedule SE Effective 01/02/2017. Below are the updates:
|
6-14-121 – Requirements for Trenching and Backfilling by Developer/Customer for Primary and Secondary Installation in a Trench with Only Electric Lines (Non-Joint Trench) Underground - General Specifications Effective 12/05/2016. Below are the updates:
|
6-14-122 – Requirements for Trenching and Backfilling by Developer/Customer for Primary and Secondary Installation in a Trench with Electric and/or Gas, Telecommunication Lines (Joint Trench) Underground - General Specifications Effective 12/05/2016. Below are the updates:
|
6-14-125 – Customer-Installed Screening of Pad-mounted Devices Underground - General Specifications Effective 12/05/2016. Below are the updates:
|
6-15-160 – Customer Installed Precast Manhole
|
6-19-100 – Customer Low-Voltage Switchboards Service Cable Terminal Compartment Arrangements and Clearances
|
6-09-196 – 12kV 3-Phase Service Metering on Customer-Owned Pole. Overhead Supply to Overhead
|
6-09-197 – 12kV 3-Phase Service Metering on Customer-Owned Pole. Overhead Supply to Underground
|
6-15-160 – Customer Installed Precast Manhole
|
6-15-180 – Customer Installed Duct System
|
6-19-133 – Installation of 120/240 Volt Single-Phase Underground Lateral Sharing a Trench with Other Utilities (Joint Trench)
|
6-19-134 – Requirements for Trenching and Backfilling by Customer for 120/240 V UndergroundService LateralsInstallation in a Trench with only Electric Lines (Non-Joint Trench)
|
6-10-165 – Requirements for Service to Customer-Owned Street Lighting Systems Served Under Rate Schedule SE
|
6-19-100 – Customer Low-Voltage Switchboards Service Cable Terminal Compartment Arrangements and Clearances
|
6-19-133 – Installation of 120/240 Volt Single-Phase Underground Lateral Sharing a Trench with Other Utilities (Joint Trench)
|
6-19-134 – Requirements for Trenching and Backfilling by Customer for 120/240 V Underground Service Laterals Installation in a Trench with only Electric Lines (Non-Joint Trench)
|
6-09-100 12kV 3-Phase Service – Electronic Controlled Recloser – On Customer Owned Pole
|
6-10-165 Outdoor Lighting – Requirements for Service to Customer-Owned Street Lighting Systems Served Under Rate Schedule SE
|
2011 Changes to CRS's are: |
6-09-194 Overhead Service to Overhead
|
6-09-199 – Installation Instructions For 3-Phase, 4 Wire WYE 7,200/12,470V Service Termination and Metering Compartments in Customer-Owned Switchgear 09/08/11 Sheet 5 Bill of Material item 3 updated. 09/08/11 Sheet 7 Updated drawing - VT's to be mounted on shelf instead of on back of metering compartment. |
6-14-121 – Requirements for Trenching and Backfilling by Developer/Customer for Primary and Secondary Installation in a Trench with Only Electric Lines (Non-Joint Trench)
|
6-14-122 – Requirements for Trenching and Backfilling by Developer/Customer for Primary and Secondary Installation in a Trench with Electric and/or Gas, Telecommunication Lines (Joint Trench)
|
REMSI RULES - List of Changes - 2020 |
Rule 19 – 07/16/2020 Added the following to b.Inspections and approvals: meter and/or service tampering or involved in theft of service |
Rule 28 - 04/04/2019
|
Rule 5 -12/11/2018
|
Rule 14 - 07/20/2018
|
Rule 12 - 06/01/2018
|
Rule 14 - 12/11/2017
|
Rule 5 - 12/8/2017
|
Rule 2 – 5/20/15
|
Rule 19 – 12/11/14 – Section B, added list of when an electrical inspection is required. |
Rule 15 – 2/27/14 – Section E, Switchgear, changed screen door to height door(s). |
Rule 7 – 2/10/14 – Section E, added statement about 175E fusing. |
Rule 8 – 2/10/14 – Section A (3), added statement about 175E fusing. |
Rule 2– 6/26/13 – Under note 4, removed sentence: “Delta served load shall be limited to those loads which can be provided by an open Wye-open delta transformer bank”. |
Rule 3– 6/26/13 – Under section d, added sentence: "Customer owned transformer banks configured as grounded wye primary and closed delta secondary shall not be connected to the PPL EU system without prior approval from PPL EU". |
Rule 1– 3/18/13 – Replaced “h” 2nd paragraph with “The customer pays the fully allocated cost of any primary or secondary facilities needed to serve the additional points of delivery”. |
Rule 19– 3/18/13 – Added to “b” 3rd paragraph 1st sentence “Inspection cut-in cards must be received at the local PPL EU office before any service request job can be scheduled”. |
Rule 2– 2/5/13 – Removed wording from Note 4, “On underground residential distribution services”. |
Rule 16– 2/5/13 – Section F – added conditions for PPL EU to waive the requirement for a termination compartment. |
Rule 2 – 10/11/12 – Revised rule 2c (residential service), requiring approval for voltages above 120/240 and requiring instrument transformers for the higher voltages. |
Rule 5 – 10/11/12 – Revised rule 5g, specifying where to connect high leg conductors in instrument transformer cabinets. |
Rule 1 - 7/29/11
|
Rule 2 - 3/4/11
|
Rule 6 - 10/26/11
|
Rule 11B - 10/26/11 Section E - added last paragraph detailing rear lot service requirements |
Rule 12 - 7/29/11 Added Section j - Grounding 3/4/11 Section f revised. |
Rule 13 - 10/26/11
|
Rule 15 - 8/12/11 Updated to include Sketch #8D and Sketch 16 Series 3/4/11 Corrected terminology |
Rule 18 - 8/12/11 Updated to include Sketch #8D and Sketch 16 Series |
Rule 19 - 10/26/11 Section G added, re-lettered Cut-In Card Documents to Section H 7/29/11
|
Rule 25A- Updated wording in 25A(a)(1) to remove requirement of installation and annual maintenance fees on demand pulse contracts. |
10/26/11 Added/revised the following definition:
3/4/11 Added/revised the following definitions:
|
Approved Metering and Equipment Tables - List of Changes - 2020 | |
11/20 | Modified Smart Connect DER-(Utility Approval Required)
|
11/06 | Added Milbank Model Number U9700-RRL-BLG on Approved Meter Service Devices-Table 3 |
11/04 | Added a new list of Manufacturers and Model numbers to the Solar Invertors |
9/04 | Milbank Model Number changed from U3939 to U3939-X on Approved Meter Service Devices-Table 2 |
9/04 | Added Catalog #1008543 to Eaton, GE, Midwest, Schneider/Square D, at Mfg's request, on Approved Meter Service Devices-Table 4 |
6/10 | Added NJ Sullivan(K&S/MECO are no longer in business) to Approved Instrument Transformer Cabinets Table 3, Table 4, Table 5 and Table 6. |
5/21 | Added a new list of Manufacturers and Model Numbers to the Solar Inverters |
5/13 | Approved Switchgear Metering & Termination Compartments-Table 3 Eaton/Cutler-Hammer added:
|
5/13 | Approved Switchgear Metering & Termination Compartments-Table 3 Square D added the following termination compartments:
Square D updated the following compartments:
|
04/29 | Added a new list of Manufacturers and Model Numbers to the Solar Inverters |
04/07 | Added a new list of Manufacturers and Model Numbers to the Solar Inverters |
03/30 | Approved Switchgear Metering and Termination Compartments-Table 3 Under Eaton/Cutler Hammer added:
|
02/24 | Added a new list of Manufacturers and Model numbers to the Solar Invertors |
02/20 | Approved Meter Service Devices-Table 11--Added RS-43308C and RS-45508C under Midwest. |
02/04 | Added ‘Referencing Sketch 16 and Sketch 16A’to add clarity to Pad Mounted Metering and Service Termination Cabinet Table 1. |
01/21 | Removed Cutler-Hammer and added Eaton/Cutler-Hammer to Switchgear Metering & Termination Compartments Table 3 |
Approved Metering and Equipment Tables - List of Changes - 2019 |
|
11/21 | Added East Coast Panelboard Mfg Part No. PPL-3200A-16-3R to Pad Mounted Metering and Service Termination Cabinet-Table 1. |
10/25 | Added a new list of Manufacturers and Model Numbers to the Solar Inverters |
10/23 | Added a new list of Manufacturers and Model Numbers to the Solar Inverters |
10/16 | Manufacturer and Catalog U2732-XT-K7 was the replacement for S-9098 on Approved Metering and Equipment Table 6 |
09/03 | Added a new list of Manufacturers and Model Numbers to the Solar Inverters |
08/26 | Pad Mounted Metering and Service Termination Cabinet-Table 1- Added Mfg Part No. column |
08/07 | Pad Mounted Metering and Service Termination Cabinet-Table 1- East Coast Panelboard (first listed) - Changed drawing number from PPL-2000A-16-3R to S-0004-000029-00 and Revision number from F to G |
08/07 | Meter Service Devices-Table 2- Removed Catalog #1004884A-SQD under Square D |
04/02 | Added new list of Manufacturers and Model Numbers to the Solar Inverters |
02/08 |
Automatic Transfer Switches-Open Transition Asco: Added (4ADTS)-Delayed to the 4000 series (4ATS) |
Approved Metering and Equipment Tables - List of Changes - 2018 |
|
11/15 | Added new list of Manufacturers and Model Numbers to the Solar Inverters |
10/11 | Added new list of Manufacturers and Model Numbers to the Solar Inverters |
07/05 |
Added new list of Manufacturers and Model Numbers to the Solar Inverters |
07/02 |
Automatic Transfer Switches-Open Transition– GE Zenith added series after RTS and added RXS series |
07/02 |
Added new list of Manufacturers and Model Numbers to the Solar Inverters |
06/29 |
Automatic Transfer Switches-Open Transition- Added 3ATS, 3ADTS, 03NTS, 3NDTS after Asco 300 series |
06/26 |
Added new list of Manufacturers and Model Numbers to the Solar Inverters |
06/07 |
Added new list of Manufacturers and Model Numbers to the Solar Inverters |
05/01 |
Approved Switchgear Metering and Termination Compartments - Table 2- Removed Reference to Square D: 43-0036-203 APPR H and 43-0036-203-AUX D. Replaced Square D Drawing 115EE3600P0H00 Page 2 and Page 1 Rev. 0. |
05/01 |
Approved Switchgear Metering and Termination Compartments – Table 1- Removed Reference to Square D: 43-0036-202 APPR J and 43-0036-202 AUX F. Replaced Square D Drawing 115EE3600P0H00 Page 2 and Page 1 Rev. 0. |
04/13 |
Added new list of Manufacturers and Model Numbers to the Solar Inverters |
03/09 |
Added new list of Manufacturers and Model Numbers to the Solar Inverters |
02/16 |
Approved Automatic Transfer Switches- Added Cummins RA Series |
01/25 |
Added new list of Manufacturers and Model Numbers to the Solar Inverters |
Approved Metering and Equipment Tables - List of Changes - 2016 |
|
08/02 |
Approved Automatic Transfer Switches – Added Global Power Products – GenerLink (Meter Collar) descriptions for each model number |
07/26 |
Approved Automatic Transfer Switches– Added 071095 (DirectPower Meter Mounted) to Briggs and Stratton. Approved Automatic Transfer Switches– Added Global Power Products – GenerLink (Meter Collar) MA 23-N, MA23-S, MA24-N, MA24-S |
04/22 |
Added New Equipment Table for12kV Customer Main Switches |
02/21 |
Added Statement to Approved Connector List for Sketch #49 Distribution Block Connectors when used for Service Drop connections to service entrance conductors shall be covered to avoid inadvertent contact. Except the neutral connection of service cable assemblies may be bare. |
04/13
Approved Metering and Equipment Tables - List of Changes - 2011 |
|
Approved Meter Services Devices - Table 11- Added Eaton to name: Eaton/Cutler Hammer. Added New Approvals Catalog #ECP511B Series, and #ECP521B Series |
|
04/20 |
Approved Switchgear Metering & Termination Compartments - Table 1- Added Eaton to name: Eaton/Cutler Hammer. Updated Drawing # 42C1054, Sheets 1, 2, Issued Revision 13 |
04/20 |
Approved Switchgear Metering & Termination Compartments - Table 2- Added Eaton to name: Eaton/Cutler Hammer. Updated Drawing # 42C1054, Sheets 1, 2, Issued Revision 13 |
05/31 |
Approved Instrument Transformer Cabinets - Table 6- Added PENN PANEL as a manufacturer. New catalog listing, PPL-724812 |
08/12 |
NEW TABLE- Pad Mounted Metering and Termination Compartment Table |
08/12 |
NEW TABLE- Connector Table |
05/04 |
|
03/26 |
Utility Reference Specification is a new section with the below references added:
|